What are the main health and safety risks in engineering work?

The serious incidents in engineering cluster around the same moments: plant that was not properly isolated, confined spaces entered without a plan, falls during access, failures during lifting operations, and hot work near combustible material. Most happen during maintenance and non routine work rather than normal operation.

Isolation, lock off and permits to work

PUWER and the Electricity at Work Regulations 1989 require equipment to be safely isolated before work on it. On complex plant that means a permit to work system, positive isolation of every energy source, including stored pressure and gravity, and a clear handback at the end of the job.

Confined spaces

Tanks, vessels, pits, ducts and silos can contain or develop a dangerous atmosphere. The Confined Spaces Regulations 1997 require entry to be avoided where possible and, where it cannot be, a safe system of work with emergency arrangements in place before anyone goes in.

Work at height and lifting operations

Access for installation and maintenance is where many falls happen. The Work at Height Regulations 2005 require the work to be planned and the right equipment used. Lifting plant into position needs a lift plan under LOLER, with lifting equipment and accessories examined and in date.

Pressure systems and hot work

Steam, compressed air and other pressure systems need a written scheme of examination under the Pressure Systems Safety Regulations 2000. Welding, cutting and grinding on site need hot work controls, fire watch and checks before and after.

CDM and working on client sites

Installing, commissioning, maintaining and removing mechanical and electrical services fixed to a structure counts as construction work under CDM 2015. That brings duties for contractors, including planning, managing and monitoring the work, and cooperating with the principal contractor. Maintenance teams also need asbestos awareness training under the Control of Asbestos Regulations 2012 where they could disturb it.

Accreditation and client approval

Most clients and principal contractors want SSIP accreditation, current RAMS, training records and insurance before engineering contractors start. We build the system behind those documents so it stands up when someone checks it.